SER Northwest launched Restoration Highlights in August 2011, a new initiative that allows members to share short articles and case studies on their restoration work and research. Since then, contributors have shared news about the Elwha dam removals, a successful shrub-steppe habitat restoration project and the process of restoring a stream channel to improve steelhead habitat.
- No. 1 July 2011: Elwha River Dam Removal
- No. 2 October 2011: UW Students Present at SER 4th World Conference
- No. 3 February 2012: A Geomorphic Restoration Approach for Steelhead Habitat in an Incised System with Floodplain Loss
- No. 4 August 2012: Happy Hill Shrub-Steppe Restoration Case Study
- No. 5 August 2013: A Good Turn for the Tolt: Restoring Channel and Floodplain Habitat Formation Processes Following 80 Years of Levee Confinement
- No. 6 October 2013: Elwha Ecosystem Restoration Project: Natural and Managed Revegetation in the Drained Reservoirs after Two Growing Seasons
- No. 7 January 2014: Revealing the Forest: English Ivy Removal in the Willamette Valley
- No. 8 September 2014: UW-REN Project: Restoration in Crestwoods Park, Kirkland, WA
- No. 9 October 2015: Restoration of Richmond Beach Saltwater Park, Shoreline, WA
- No. 10 March 2017: Ecological Burning for South Puget Sound Prairies and Oaks
