BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//SER-Rocky Mountains - ECPv6.17.5.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://chapter.ser.org/rockymountains
X-WR-CALDESC:Events for SER-Rocky Mountains
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Denver
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20250309T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20251102T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20260308T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20261101T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20270314T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20271107T080000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Denver:20260827T150000
DTEND;TZID=America/Denver:20260827T170000
DTSTAMP:20260810T211121Z
CREATED:20260810T203812Z
LAST-MODIFIED:20260810T211121Z
UID:2763-1787842800-1787850000@chapter.ser.org
SUMMARY:Mile High Flood District Stream Improvements Field Tour
DESCRIPTION:Join us on Thursday August 27\, from 3:00-5:00pm for a special tour of two Mile High Flood District stream improvement projects within the Denver Metro Area\, followed by a happy hour sponsored by the Society for Ecological Restoration at the Green Valley Beer Garden. The site tours will run approximately 2 hours\, followed by the happy hour with complementary appetizers and table fare. We will be joined by two special guests from MHFD\, David Skoudas the Education and Outreach Director\, and KristiLee Halpin\, an Environmental Specialist. \nRegistration is required and limited to 35 people. Click on the link below to register for this event!  \n\nThe schedule of events begins with a tour of the improvements recently completed in spring 2025 as part of Phase 2 of the Uvalda Tributary to Irondale Drainageway Improvement Project. We will meet at the Uvalda Trailhead on the north side of the intersection of 56th Avenue and Uvalda Street in Denver. There is some trailhead parking\, and additional parking in the neighborhood south of 56th Avenue. \nFollowing the Uvalda site\, we will convene at First Creek Park at 18874 Elmendorf Dr\, Denver\, CO 80249\, for a tour of the First Creek Park Project which transitioned into long term maintenance in 2023. There should be ample street parking nearby. \n\n\n\nUvalda Tributary to Irondale Drainageway Improvements Phase 2 (Project Center Point: 39.796890\, -104.835554) \n\nDrainage improvements designed to increase channel capacity and reduce flood risk within a residential neighborhood.\nReplacement of a concrete-lined channel with a natural channel-bottom system\, incorporating enhancements that improve community value and ecological function.\nSuccessful design and construction within a constrained urban corridor\, requiring coordination with numerous existing utilities and site constraints.\nImproved connectivity to the adjacent greenway and trail system.\nIncreased green space and enhanced aesthetics within the surrounding residential neighborhood.\nConstruction was completed in Spring 2025\, and the site is currently undergoing vegetation establishment and monitoring.\n\nFirst Creek Park (Project Center Point: 39.794544\, -104.768531) \n\nImprovements to increase channel capacity\nEnhanced community value by establishment of First Creek Park with dedicated nature play features\, including low water crossing to access the creek\nConstruction was completed in 2019\, and the site was transitioned to long-term maintenance in 2023.\n\n\n\nThe mission of the Mile High Flood District is to protect people\, property\, and our environment through preservation\, mitigation\, and education. MHFD proactively protects the Denver Metro Area from flooding repercussions through applying innovative solutions that address stormwater and watershed holistically.\n\nKristiLee Halpin\nKristiLee Halpin is an Environmental Specialist at the Mile High Flood District\, specializing in wetland and riparian ecosystems within the Denver Metropolitan area. She brings extensive experience in stream restoration\, spanning ecological design\, environmental permitting\, and vegetation establishment\, with a focus on achieving high-functioning\, low-maintenance systems with long-term resilience. KristiLee combines technical expertise with applied problem-solving and collaboration to advance sustainable\, adaptive approaches to watershed and stormwater management.\nDavid Skuodas\nDavid Skuodas is the Education and Outreach Director at the Mile High Flood District\, where he focuses on industry education\, advocating for smart policy and infrastructure funding\, and effective community engagement.  Prior to this role\, Dave worked for 25 years on both the private and public sides to deliver capital construction projects along Denver’s urban waterways. He’s a civil engineer by training and is the author of a book called The Effective Client: Why Being a Good Client is Smart Business in the AEC Industry.\n\nCEC hours: 2 hours total of instruction from MHFD staff.
URL:https://chapter.ser.org/rockymountains/event/mile-high-flood-district-stream-improvements-field-tour/
LOCATION:First Creek Park\, 18874 Elmendorf Drive\, Denver\, CO\, 80249\, United States
END:VEVENT
END:VCALENDAR