{"id":4446,"date":"2026-04-28T10:52:26","date_gmt":"2026-04-28T17:52:26","guid":{"rendered":"https:\/\/chapter.ser.org\/northwest\/?p=4446"},"modified":"2026-04-29T08:37:53","modified_gmt":"2026-04-29T15:37:53","slug":"the-spotted-dog-floodplain-and-slope-wetland-restoration-project","status":"publish","type":"post","link":"https:\/\/chapter.ser.org\/northwest\/the-spotted-dog-floodplain-and-slope-wetland-restoration-project\/","title":{"rendered":"The Spotted Dog Floodplain and Slope Wetland Restoration Project"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Introduction<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In March, we had the opportunity to chat with Amy Sacry, former SERNW Board Member and co-founder of <a href=\"https:\/\/geumconsulting.com\/\" id=\"https:\/\/geumconsulting.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">Geum Environmental Consulting<\/a>, to learn about the first full valley reset with the goal of achieving a Stage Zero channel state in Montana. The project is part of a larger effort being undertaken by Montana Fish, Wildlife and Parks (FWP) and Montana Natural Resource Damage Program (NRDP) to reconnect degraded streams to their floodplains, enhance and expand wetland and riparian habitat, and hold water on the landscape longer into the dry season each year. This work is occurring at the Spotted Dog Wildlife Management Area (SDWMA) near Avon, Montana.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Amy talked about building a consulting firm from the ground up and reflected on the learning she\u2019s carried forward from both her education and her fieldwork. She then walked us through the South Fork Spotted Dog Stage Zero restoration project. She conveyed a clear sense of purpose, and we\u2019re grateful to be sharing this restoration story with you.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">From Learning to Doing<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Amy studied biology as an undergraduate student, which included a study abroad in Cairns, Australia where she expanded her knowledge of ecological restoration and riparian ecology. It was this experience and the deeper delve into riparian ecology that navigated her to riparian wetland postgraduate research at the University of Montana.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During her studies, Amy also gained field experience as a seasonal employee with the Bureau of Land Management (BLM). This exposed her to streambank bioengineering, riparian revegetation, and river restoration using large wood. She described the challenges of her fieldwork, the learning opportunities offered by professors and BLM leaders working on stream restoration projects, and how the BLM work ultimately contributed to her thesis research.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">After her postgraduate studies, Amy worked for an environmental consulting firm, where she met her co-founders, Tom Parker and Sarah Flynn. In 2003, they started Geum Environmental Consulting and have since worked on projects throughout Montana and Idaho.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Initially focusing largely on revegetation, they eventually grew their portfolio of projects and expertise. Their staff grew along with it as they took on increasingly larger scales and varied work over the years.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"450\" data-id=\"4496\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/LeikMillerCrk_VolunteerDay_Admiringthework-1-600x450.jpg\" alt=\"People standing in a creek.\" class=\"wp-image-4496\" srcset=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/LeikMillerCrk_VolunteerDay_Admiringthework-1-600x450.jpg 600w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/LeikMillerCrk_VolunteerDay_Admiringthework-1-300x225.jpg 300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/LeikMillerCrk_VolunteerDay_Admiringthework-1-768x576.jpg 768w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/LeikMillerCrk_VolunteerDay_Admiringthework-1-1536x1152.jpg 1536w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/LeikMillerCrk_VolunteerDay_Admiringthework-1-2048x1536.jpg 2048w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/LeikMillerCrk_VolunteerDay_Admiringthework-1-2000x1500.jpg 2000w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/LeikMillerCrk_VolunteerDay_Admiringthework-1-450x338.jpg 450w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/LeikMillerCrk_VolunteerDay_Admiringthework-1-1500x1125.jpg 1500w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/LeikMillerCrk_VolunteerDay_Admiringthework-1-1300x975.jpg 1300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/LeikMillerCrk_VolunteerDay_Admiringthework-1-400x300.jpg 400w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Geum staff volunteering on the Clark Fork Coalition&#8217;s Miller Creek restoration project.<br>Photo Credit: Geum Environmental Consulting. <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"450\" data-id=\"4495\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SmithRiverBoatCamp_Collab-1-600x450.jpg\" alt=\"People standing on a river bank and some below, looking at erosion.\" class=\"wp-image-4495\" srcset=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SmithRiverBoatCamp_Collab-1-600x450.jpg 600w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SmithRiverBoatCamp_Collab-1-300x225.jpg 300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SmithRiverBoatCamp_Collab-1-768x576.jpg 768w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SmithRiverBoatCamp_Collab-1-1536x1152.jpg 1536w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SmithRiverBoatCamp_Collab-1-2048x1536.jpg 2048w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SmithRiverBoatCamp_Collab-1-2000x1500.jpg 2000w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SmithRiverBoatCamp_Collab-1-450x338.jpg 450w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SmithRiverBoatCamp_Collab-1-1500x1125.jpg 1500w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SmithRiverBoatCamp_Collab-1-1300x975.jpg 1300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SmithRiverBoatCamp_Collab-1-400x300.jpg 400w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Geum staff with FWP to address erosion issues at Smith River State Park boat camps. <br>Photo Credit: Geum Environmental Consulting.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"452\" data-id=\"4497\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/ZeedykMonitoring_GeumFWPNRDP-600x452.jpg\" alt=\"People in a field with blue sky and clouds overhead.\" class=\"wp-image-4497\" srcset=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/ZeedykMonitoring_GeumFWPNRDP-600x452.jpg 600w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/ZeedykMonitoring_GeumFWPNRDP-300x226.jpg 300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/ZeedykMonitoring_GeumFWPNRDP-768x578.jpg 768w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/ZeedykMonitoring_GeumFWPNRDP-1536x1157.jpg 1536w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/ZeedykMonitoring_GeumFWPNRDP-2048x1542.jpg 2048w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/ZeedykMonitoring_GeumFWPNRDP-2000x1506.jpg 2000w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/ZeedykMonitoring_GeumFWPNRDP-450x339.jpg 450w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/ZeedykMonitoring_GeumFWPNRDP-1500x1129.jpg 1500w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/ZeedykMonitoring_GeumFWPNRDP-1300x979.jpg 1300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/ZeedykMonitoring_GeumFWPNRDP-400x301.jpg 400w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Geum staff monitoring Zeedyk structures with FWP and NRDP. <br>Photo Credit: Geum Environmental Consulting.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"510\" data-id=\"4498\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/team_geum-1-600x510.png\" alt=\"Team of people standing at edge of a river.\" class=\"wp-image-4498\" srcset=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/team_geum-1-600x510.png 600w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/team_geum-1-300x255.png 300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/team_geum-1-768x653.png 768w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/team_geum-1-1536x1306.png 1536w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/team_geum-1-2048x1741.png 2048w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/team_geum-1-2000x1701.png 2000w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/team_geum-1-450x383.png 450w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/team_geum-1-1500x1275.png 1500w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/team_geum-1-1300x1105.png 1300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/team_geum-1-400x340.png 400w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Geum Environmental Consulting team after a river safety float in fall 2025. <br>Photo Credit: Geum Environmental Consulting.<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Her commitment to project restoration outcomes was evident as she spoke candidly about the realities of ecological restoration. The work demands travel, strong writing and technical skills, and resilience in challenging conditions.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-dots\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Floodplain Restoration on the Spotted Dog Wildlife Management Area, Montana<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The SDWMA is a 38,000 acre area purchased by the State of Montana in 2010 to protect wildlife, restore natural resources, and provide public hunting and recreation access. The purchase was funded through the NRDP.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to FWP, portions of SDWMA existed in a degraded state due to a long legacy of livestock grazing, fluctuating populations of native grazers and browsers (i.e., elk and moose), removal of beavers, and invasion by noxious weeds and other non-native plants. Degraded streams and wetlands on the WMA have functioned well below their ecological capacity, providing diminished habitat for fish and wildlife species relative to their potential. What&#8217;s more, these streams and wetlands function below capacity for providing ecosystem services to humans, such as landscape water storage, water quality improvements, and recreational opportunities like hunting, fishing, and wildlife watching.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The restoration potential of streams and wetlands on the SDWMA were identified in 2014 when multiple tributaries in the Little Blackfoot River drainage were assessed by Geum under contract with NRDP to identify opportunities to create or enhance riparian and wetland habitat. Funding for this assessment and subsequent riparian and wetland restoration efforts is tied to the 1999 Streamside Tailings Consent Decree, which included money for the State of Montana to create or restore wetlands and riparian areas in the Upper Clark Fork River Basin.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The 2014 assessment identified extensive channel incision and loss of floodplain connectivity affecting streams on the SDWMA, resulting in the loss or reduced function of wetland and riparian areas. Further, the assessment showed that large areas of intact floodplain supporting willows and remnant channel systems were also present in many areas, increasing the potential for successful floodplain reconnection and wetland and riparian habitat creation. In 2020, working closely with FWP and NRDP, Geum began multiple phases of restoration work to reconnect several miles of streams to their floodplains and restore degraded slope wetlands on the SDWMA. The restoration efforts have contributed to the return of fauna, notably, beaver populations.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-dots\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Planning and Design<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Planning and design were collaborative efforts between Geum, FWP, and NRDP. NRDP\u2019s goal was to create or enhance as much riparian and wetland area as possible with the available funds. FWP\u2019s goal for the work was to create habitat that would allow for the expansion of beaver populations ultimately improving habitat for a wide range of species. Restoration strategies included both active and passive techniques.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">LiDAR elevation data and high-resolution drone imagery guided decisions on where floodplains could be reconnected. Floodplains were reconnected through construction of main channel plugs that re-routed stream flows and allowed reconnection of large areas of historically connected floodplains. Construction of structures that mimic the effects of beaver dams were also used, such as backwatering the channel, increasing channel depth, and routing high flows onto adjacent floodplain surfaces.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"450\" data-id=\"4499\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SDMainChannel_entrenched_before-600x450.jpeg\" alt=\"A stream with heavy vegetation along the banks.\" class=\"wp-image-4499\" srcset=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SDMainChannel_entrenched_before-600x450.jpeg 600w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SDMainChannel_entrenched_before-300x225.jpeg 300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SDMainChannel_entrenched_before-768x576.jpeg 768w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SDMainChannel_entrenched_before-1536x1152.jpeg 1536w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SDMainChannel_entrenched_before-2000x1500.jpeg 2000w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SDMainChannel_entrenched_before-450x338.jpeg 450w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SDMainChannel_entrenched_before-1500x1125.jpeg 1500w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SDMainChannel_entrenched_before-1300x975.jpeg 1300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SDMainChannel_entrenched_before-400x300.jpeg 400w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SDMainChannel_entrenched_before.jpeg 2048w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Heavily degraded stream channel on the Spotted Dog WMA where channel incision has resulted in lost floodplain connectivity and habitat.<br>Photo Credit: Geum Environmental Consulting.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"450\" data-id=\"4501\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/PA140053-600x450.jpg\" alt=\"Stream with elevated banks in the valley.\" class=\"wp-image-4501\" srcset=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/PA140053-600x450.jpg 600w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/PA140053-300x225.jpg 300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/PA140053-768x576.jpg 768w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/PA140053-1536x1152.jpg 1536w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/PA140053-2048x1536.jpg 2048w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/PA140053-2000x1500.jpg 2000w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/PA140053-450x338.jpg 450w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/PA140053-1500x1125.jpg 1500w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/PA140053-1300x975.jpg 1300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/PA140053-400x300.jpg 400w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Incised stream condition on Spotted Dog Creek prior to restoration. <br>Photo Credit: Geum Environmental Consulting.<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">A wide valley bottom at the lower end of the South Fork of Spotted Dog Creek offered a different opportunity. The heavily incised channel did not allow for reconnection using other treatments and the floodplain did not support remnant willow communities similar to other reconnection areas. Through an interdisciplinary process, the decision was made to regrade the valley bottom to create a Stage Zero condition that would support maximum floodplain connectivity and therefore maximum riparian and wetland habitat creation.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Restoration planning and design at SDWMA also considered water supply to perennial stream channels; in these areas, floodplain reconnections were pursued. The SDWMA landscape supports a wide range of slope wetland features. These wetlands historically lacked defined channels, but a legacy of disturbance has caused many to &#8216;unzip,&#8217; with headcuts forming and migrating upstream. LiDAR elevation data, aerial imagery, infrared imagery, and existing spatial data layers were used to identify where this had occurred and where restoration could restore the largest wetland areas. Designs focused on arresting headcuts and restoring natural wetland hydrology.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-dots\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Implementation: Putting Plans to Work<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">With the goals in mind and the designs outlined, twenty-five Beaver Habitat Structures were installed, along with one main channel plug that restored surface flow to an uninhabited beaver complex. Within months, beavers reoccupied the site, building new dams and establishing a colony.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Encouraged by this success, subsequent phases in 2022 and 2024 added more structures and plugs. Similar to the first phase, beavers rapidly colonized restoration sites, building numerous new dams within days at one site. In 2024, several slope wetland restoration treatments were also completed, including regrading of a ditch that intercepted wetland flows, and construction of 85 Zeedyk rock structures to arrest headcut progression in a large slope wetland complex. Zeedyk structures are low-profile rock structures built by hand to reduce erosion and restore the hydrologic and ecological functions of wet meadows and wetlands. NRDP used the Montana-based Youth Employment Program to install these structures.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-3 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"4506\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SD_BeforeMainPlug_2020-1-600x429.jpg\" alt=\"Aerial view of the valley with lots of trees and a narrow river.\" class=\"wp-image-4506\" \/><figcaption class=\"wp-element-caption\">Aerial view of Spotted Dog Creek before installation of a main plug (July 2020). <br>Photo Credit: Geum Environmental Consulting<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"429\" data-id=\"4504\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SD_AfterMainPlug_2025_Year5-600x429.jpg\" alt=\"Aerial view of the valley where the river has expanded across the entire valley.\" class=\"wp-image-4504\" srcset=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SD_AfterMainPlug_2025_Year5-600x429.jpg 600w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SD_AfterMainPlug_2025_Year5-300x214.jpg 300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SD_AfterMainPlug_2025_Year5-768x549.jpg 768w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SD_AfterMainPlug_2025_Year5-1536x1097.jpg 1536w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SD_AfterMainPlug_2025_Year5-2048x1463.jpg 2048w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SD_AfterMainPlug_2025_Year5-2000x1429.jpg 2000w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SD_AfterMainPlug_2025_Year5-450x321.jpg 450w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SD_AfterMainPlug_2025_Year5-1500x1071.jpg 1500w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SD_AfterMainPlug_2025_Year5-1300x929.jpg 1300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SD_AfterMainPlug_2025_Year5-400x286.jpg 400w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Aerial view of Spotted Dog Creek 5 years after installation of a main channel plug (May 2025). <br>Photo Credit: Geum Environmental Consulting.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"450\" data-id=\"4500\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Headwater-wetland-active-headcut-600x450.jpeg\" alt=\"Vegetation covered valley with cows.\" class=\"wp-image-4500\" srcset=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Headwater-wetland-active-headcut-600x450.jpeg 600w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Headwater-wetland-active-headcut-300x225.jpeg 300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Headwater-wetland-active-headcut-768x576.jpeg 768w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Headwater-wetland-active-headcut-1536x1152.jpeg 1536w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Headwater-wetland-active-headcut-2000x1500.jpeg 2000w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Headwater-wetland-active-headcut-450x338.jpeg 450w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Headwater-wetland-active-headcut-1500x1125.jpeg 1500w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Headwater-wetland-active-headcut-1300x975.jpeg 1300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Headwater-wetland-active-headcut-400x300.jpeg 400w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Headwater-wetland-active-headcut.jpeg 2048w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Headwater slope wetland headcut prior to treatment using a Zeedyk Zuni bowl rock structure (before). <br>Photo Credit: Geum Environmental Consulting.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"450\" data-id=\"4502\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Zeedyk_LargeZuniBowl_after-600x450.jpg\" alt=\"rock bowl structure in valley where water is flowing.\" class=\"wp-image-4502\" srcset=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Zeedyk_LargeZuniBowl_after-600x450.jpg 600w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Zeedyk_LargeZuniBowl_after-300x225.jpg 300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Zeedyk_LargeZuniBowl_after-768x576.jpg 768w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Zeedyk_LargeZuniBowl_after-1536x1152.jpg 1536w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Zeedyk_LargeZuniBowl_after-2048x1536.jpg 2048w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Zeedyk_LargeZuniBowl_after-2000x1500.jpg 2000w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Zeedyk_LargeZuniBowl_after-450x338.jpg 450w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Zeedyk_LargeZuniBowl_after-1500x1125.jpg 1500w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Zeedyk_LargeZuniBowl_after-1300x975.jpg 1300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/Zeedyk_LargeZuniBowl_after-400x300.jpg 400w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Headwater slope wetland headcut after treatment using a Zeedyk large Zuni bowl structure (after). <br>Photo Credit: Geum Environmental Consulting.<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-dots\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Stage Zero &#8212; A Valley Reset for lower South Fork Spotted Dog Creek<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Resetting a valley bottom to a Stage Zero condition is a rare opportunity, feasible only in certain valley types. This restoration approach is a process-based design method that aims to restore the valley to the historical valley floor elevation or geomorphic grade line.<sup data-fn=\"96da3d99-cef5-4e4e-a468-7ca5b95ca561\" class=\"fn\"><a href=\"#96da3d99-cef5-4e4e-a468-7ca5b95ca561\" id=\"96da3d99-cef5-4e4e-a468-7ca5b95ca561-link\">1<\/a><\/sup> Given that this approach to floodplain restoration is relatively new, the project team solicited technical expertise from the U.S. Forest Service Adaptive Management Services Enterprise Team.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Unlike typical Stage Zero projects where floodplain materials consist of coarse gravel and alluvium, floodplain materials at this site consist of three feet of silt loam soils. This means that&nbsp; rapid vegetation establishment to restore the natural biological control for floodplain erosion is key to project success. As opposed to gravel-bedded floodplains where wood is used extensively for erosion control, at this site vegetation needs to come in fast to stabilize soils and prevent soil erosion and incised channel formation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The team is seeing that the same volume of water is entering and exiting the Stage Zero project site, but in a very different way than it did previously. In some areas, you can\u2019t even walk across the valley bottom because the floodplain is fully engaged, with water spreading out and slowing down. That shift is creating clear habitat diversity and depth variability that did not exist before.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-4 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"450\" data-id=\"4509\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/StageZero_lookingupstream_before1-600x450.jpeg\" alt=\"A river valley covered in vegetation.\" class=\"wp-image-4509\" srcset=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/StageZero_lookingupstream_before1-600x450.jpeg 600w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/StageZero_lookingupstream_before1-300x225.jpeg 300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/StageZero_lookingupstream_before1-768x576.jpeg 768w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/StageZero_lookingupstream_before1-1536x1152.jpeg 1536w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/StageZero_lookingupstream_before1-2000x1500.jpeg 2000w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/StageZero_lookingupstream_before1-450x338.jpeg 450w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/StageZero_lookingupstream_before1-1500x1125.jpeg 1500w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/StageZero_lookingupstream_before1-1300x975.jpeg 1300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/StageZero_lookingupstream_before1-400x300.jpeg 400w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/StageZero_lookingupstream_before1.jpeg 2048w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">View of the Stage Zero project site valley, looking upstream, before restoration (2024). <br>Photo Credit: Geum Environmental Consulting.<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-5 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"429\" data-id=\"4507\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_BeforeStageZero-600x429.jpg\" alt=\"Aerial view of river valley and surrounding trees.\" class=\"wp-image-4507\" srcset=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_BeforeStageZero-600x429.jpg 600w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_BeforeStageZero-300x214.jpg 300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_BeforeStageZero-768x549.jpg 768w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_BeforeStageZero-1536x1097.jpg 1536w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_BeforeStageZero-2048x1463.jpg 2048w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_BeforeStageZero-2000x1429.jpg 2000w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_BeforeStageZero-450x321.jpg 450w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_BeforeStageZero-1500x1071.jpg 1500w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_BeforeStageZero-1300x929.jpg 1300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_BeforeStageZero-400x286.jpg 400w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Aerial view of South Fork Spotted Dog Creek Stage Zero project site prior to restoration (2020). <br>Photo Credit: Geum Environmental Consulting.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"429\" data-id=\"4508\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_AfterStageZero-600x429.jpg\" alt=\"Aerial view of river valley after the restoration project, with a wider area for the river to flow.\" class=\"wp-image-4508\" srcset=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_AfterStageZero-600x429.jpg 600w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_AfterStageZero-300x214.jpg 300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_AfterStageZero-768x549.jpg 768w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_AfterStageZero-1536x1097.jpg 1536w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_AfterStageZero-2048x1463.jpg 2048w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_AfterStageZero-2000x1429.jpg 2000w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_AfterStageZero-450x321.jpg 450w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_AfterStageZero-1500x1071.jpg 1500w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_AfterStageZero-1300x929.jpg 1300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/SFSD_AfterStageZero-400x286.jpg 400w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Aerial view of South Fork Spotted Dog Creek Stage Zero project site after restoration <br>(July 2025). <br>Photo Credit: Geum Environmental Consulting.&nbsp;<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-dots\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">What\u2019s Next: Monitoring &amp; Evaluation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">To date, more than 40 acres of floodplain have been reconnected and 3 acres of headwater slope wetlands have been restored. Beaver populations are expanding throughout the restoration areas, further promoting floodplain connectivity. The Stage Zero site alone resulted in an estimated 14.2 acre-feet of additional floodplain water volume and a 2-foot rise in groundwater elevation.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Monitoring and adaptive management are a big part of the team\u2019s work. Each year, project partners evaluate the restoration work and implement maintenance where necessary to ensure treatments continue to function. NRDP is monitoring the work to document the number of acres of wetland and riparian area the work has created or enhanced. Monitoring is also required by permitting agencies to document wetland development. High-resolution drone imagery is collected each year to document the extent of wetted area and floodplain reconnection created by restoration treatments. In addition, FWP monitors beaver populations each year, allowing project partners to understand the effect of restoration actions on beaver habitat creation and occupancy. FWP also established permanent vegetation plots to evaluate changes in vegetation compositions in response to restoration actions. Integrated Monitoring in Bird Conservation Regions (IMBCR) surveys also pass through the project area, collecting breeding bird and habitat structure data.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-6 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"450\" data-id=\"4515\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-3-1-600x450.jpg\" alt=\"Aerial view of the river valley.\" class=\"wp-image-4515\" srcset=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-3-1-600x450.jpg 600w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-3-1-300x225.jpg 300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-3-1-768x575.jpg 768w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-3-1-1536x1151.jpg 1536w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-3-1-2048x1534.jpg 2048w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-3-1-2000x1498.jpg 2000w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-3-1-450x337.jpg 450w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-3-1-1500x1124.jpg 1500w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-3-1-1300x974.jpg 1300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-3-1-400x300.jpg 400w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Drone footage after Stage Zero project implementation <br>(July 2025). <br>Photo Credit: Geum Environmental Consulting.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"450\" data-id=\"4513\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-2-1-600x450.jpg\" alt=\"Aerial view of the river valley.\" class=\"wp-image-4513\" srcset=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-2-1-600x450.jpg 600w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-2-1-300x225.jpg 300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-2-1-768x575.jpg 768w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-2-1-1536x1151.jpg 1536w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-2-1-2048x1534.jpg 2048w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-2-1-2000x1498.jpg 2000w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-2-1-450x337.jpg 450w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-2-1-1500x1124.jpg 1500w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-2-1-1300x974.jpg 1300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-2-1-400x300.jpg 400w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Drone footage after Stage Zero project implementation <br>(July 2025). <br>Photo Credit: Geum Environmental Consulting.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"450\" data-id=\"4514\" src=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-1-1-600x450.jpg\" alt=\"Aerial view of the river valley.\" class=\"wp-image-4514\" srcset=\"https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-1-1-600x450.jpg 600w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-1-1-300x225.jpg 300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-1-1-768x575.jpg 768w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-1-1-1536x1151.jpg 1536w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-1-1-2048x1534.jpg 2048w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-1-1-2000x1498.jpg 2000w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-1-1-450x337.jpg 450w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-1-1-1500x1124.jpg 1500w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-1-1-1300x974.jpg 1300w, https:\/\/chapter.ser.org\/northwest\/files\/2026\/04\/After_drone-oblique-1-1-400x300.jpg 400w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Drone footage after Stage Zero project implementation <br>(July 2025). <br>Photo Credit: Geum Environmental Consulting.<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<ol class=\"wp-block-footnotes\"><li id=\"96da3d99-cef5-4e4e-a468-7ca5b95ca561\">Powers et al. (2019). A process\u2010based approach to restoring depositional river valleys to Stage 0, an anastomosing channel network.\u00a0<em>River Research and Applications<\/em>,\u00a0<em>35<\/em>(1), 3-13. https:\/\/doi.org\/10.1002\/rra.3378 <a href=\"#96da3d99-cef5-4e4e-a468-7ca5b95ca561-link\" aria-label=\"Jump to footnote reference 1\">\u21a9\ufe0e<\/a><\/li><\/ol>\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-dots\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Amy\u2019s Recommended Articles<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/onlinelibrary.wiley.com\/doi\/full\/10.1002\/rra.3421\" target=\"_blank\" rel=\"noreferrer noopener\">The stream evolution triangle: Integrating geology, hydrology, and biology<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/doi.org\/10.1002\/rra.2631\" target=\"_blank\" rel=\"noreferrer noopener\">A stream evolution model integrating habitat and ecosystem benefits<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/onlinelibrary.wiley.com\/doi\/10.1002\/rra.3378\" target=\"_blank\" rel=\"noreferrer noopener\">A process-based approach to restoring depositional river valleys to Stage 0, an anastomosing channel network<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/onlinelibrary.wiley.com\/doi\/10.1111\/rec.13032\" target=\"_blank\" rel=\"noreferrer noopener\">Habitat conditions at beaver settlement sites: implications for beaver restoration projects<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.frontiersin.org\/journals\/earth-science\/articles\/10.3389\/feart.2021.653623\/full\" target=\"_blank\" rel=\"noreferrer noopener\">Rediscovering, Reevaluating, and Restoring Lost River-Wetland Corridors<\/a><\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-dots\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">More about Geum and the SDWMA Project<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"http:\/\/www.geumconsulting.com\" target=\"_blank\" rel=\"noreferrer noopener\">Geum Environmental Consulting<\/a>&nbsp;<\/li>\n\n\n\n<li><a href=\"https:\/\/dojmt.gov\/nrdp\/\" target=\"_blank\" rel=\"noreferrer noopener\">Montana Depart of Justice: Natural Resource Damage Program<\/a>\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<div style=\"height:64px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Explore the first full valley reset in Montana at the Spotted Dog Wildlife Management Area (SDWMA) to achieve a Stage Zero channel state.<\/p>\n","protected":false},"author":125,"featured_media":4513,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":true,"footnotes":"[{\"id\":\"96da3d99-cef5-4e4e-a468-7ca5b95ca561\",\"content\":\"Powers et al. (2019). A process\\u2010based approach to restoring depositional river valleys to Stage 0, an anastomosing channel network.\\u00a0<em>River Research and Applications<\\\/em>,\\u00a0<em>35<\\\/em>(1), 3-13. https:\\\/\\\/doi.org\\\/10.1002\\\/rra.3378\"}]","_links_to":"","_links_to_target":""},"categories":[4,23],"tags":[],"class_list":["post-4446","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-restoration-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/chapter.ser.org\/northwest\/wp-json\/wp\/v2\/posts\/4446","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/chapter.ser.org\/northwest\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/chapter.ser.org\/northwest\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/chapter.ser.org\/northwest\/wp-json\/wp\/v2\/users\/125"}],"replies":[{"embeddable":true,"href":"https:\/\/chapter.ser.org\/northwest\/wp-json\/wp\/v2\/comments?post=4446"}],"version-history":[{"count":0,"href":"https:\/\/chapter.ser.org\/northwest\/wp-json\/wp\/v2\/posts\/4446\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/chapter.ser.org\/northwest\/wp-json\/wp\/v2\/media\/4513"}],"wp:attachment":[{"href":"https:\/\/chapter.ser.org\/northwest\/wp-json\/wp\/v2\/media?parent=4446"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/chapter.ser.org\/northwest\/wp-json\/wp\/v2\/categories?post=4446"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/chapter.ser.org\/northwest\/wp-json\/wp\/v2\/tags?post=4446"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}